Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 20 results ...

Bobick, T G (2004) Falls through Roof and Floor Openings and Surfaces, Including Skylights: 1992–2000. Journal of Construction Engineering and Management, 130(06), 895–907.

Chan, S and Leung, N (2004) Prototype Web-Based Construction Project Management System. Journal of Construction Engineering and Management, 130(06), 935–43.

Cheah, C Y J, Garvin, M J and Miller, J B (2004) Empirical Study of Strategic Performance of Global Construction Firms. Journal of Construction Engineering and Management, 130(06), 808–17.

Cheng, E W L and Li, H (2004) Development of a Practical Model of Partnering for Construction Projects. Journal of Construction Engineering and Management, 130(06), 790–8.

Cheung, S O, Yiu, K T W and Suen, H (2004) Construction Negotiation Online. Journal of Construction Engineering and Management, 130(06), 844–52.

Chung, T H, Abraham, D M and Gokhale, S B (2004) Decision Support System for Microtunneling Applications. Journal of Construction Engineering and Management, 130(06), 835–43.

Fang, D, Fong, P S and Li, M (2004) Risk Assessment Model of Tendering for Chinese Building Projects. Journal of Construction Engineering and Management, 130(06), 862–8.

  • Type: Journal Article
  • Keywords: China; Construction industry; Risk management; Contractors; Regression models;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2004)130:6(862)
  • Abstract:
    This paper presents a risk assessment model for tendering of Chinese building projects on the basis of identification and evaluation of the major risk events in the Chinese construction market, investigations and interviews from which the factors inducing the risk events were determined, questionnaires on building projects within China’s borders, and the logistic regression method. The findings show that, to a certain extent, the risk of tendering for projects and the risk of a contracted project can be assessed through analysis of factors such as owner type, source of project financing, existence or lack of past cooperation between contractors and owners, the intensity of competition for tendering, the reasonableness of the bid price, and the degree of support from the contracting company to its projects. The model can serve as a supplementary tool for Chinese contractors in making decisions for project tendering within Chinese borders. At the same time, it is of reference significance for international contractors, enabling them to further understand the risks in the contract market for Chinese building projects.

Fang, D, Li, M, Fong, P S and Shen, L (2004) Risks in Chinese Construction Market—Contractors’ Perspective. Journal of Construction Engineering and Management, 130(06), 853–61.

Hanna, A S, Camlic, R, Peterson, P A and Lee, M (2004) Cumulative Effect of Project Changes for Electrical and Mechanical Construction. Journal of Construction Engineering and Management, 130(06), 762–71.

Koksal, A and Arditi, D (2004) Predicting Construction Company Decline. Journal of Construction Engineering and Management, 130(06), 799–807.

Lee, H, Yu, J and Kim, S (2004) Impact of Labor Factors on Workflow. Journal of Construction Engineering and Management, 130(06), 918–23.

Marzouk, M and Moselhi, O (2004) Fuzzy Clustering Model for Estimating Haulers’ Travel Time. Journal of Construction Engineering and Management, 130(06), 878–86.

Rowe, G M, Meegoda, J N, Jumikis, A, Sharrock, M J, Bandara, N and Hettiarachchi, C H (2004) NJTxtr—A Computer Program Based on LASER to Monitor Asphalt Segregation. Journal of Construction Engineering and Management, 130(06), 924–34.

Senouci, A B and Eldin, N N (2004) Use of Genetic Algorithms in Resource Scheduling of Construction Projects. Journal of Construction Engineering and Management, 130(06), 869–77.

Son, J and Mattila, K G (2004) Binary Resource Leveling Model: Activity Splitting Allowed. Journal of Construction Engineering and Management, 130(06), 887–94.

Tam, C M, Tong, T K L and Wong, Y W (2004) Selection of Concrete Pump Using the Superiority and Inferiority Ranking Method. Journal of Construction Engineering and Management, 130(06), 827–34.

Thomas, H R, Horman, M J and de Souza, U E L (2004) Symbiotic Crew Relationships and Labor Flow. Journal of Construction Engineering and Management, 130(06), 908–17.

Tsao, C C Y, Tommelein, I D, Swanlund, E S and Howell, G A (2004) Work Structuring to Achieve Integrated Product–Process Design. Journal of Construction Engineering and Management, 130(06), 780–9.

Walsh, K D, Hershauer, J C, Tommelein, I D and Walsh, T A (2004) Strategic Positioning of Inventory to Match Demand in a Capital Projects Supply Chain. Journal of Construction Engineering and Management, 130(06), 818–26.

Whalen, T M, Gopal, S and Abraham, D M (2004) Cost-Benefit Model for the Construction of Tornado Shelters. Journal of Construction Engineering and Management, 130(06), 772–9.